Quotation Summary
A consolidated internal report for an informed commercial decision.
Internal decision-support report · not a final customer quotation. All documentation, prices, inventory and delivery assumptions are simulated.
FLEXCON SRO / QUOTATION DECISION REPORT
Not ReadyVolvo CE – Excavator Wiring Harness
QT-2026-001 · Martin Novák · Target quotation date: 2026-12-04
Material cost / product
€63.92
Preliminary Material Cost – Incomplete Pricing
Annual material cost
€31,960.53
500 products · Medium
Procurement lead time
12 weeks
Simplified sourcing estimate
Outstanding exceptions
13
3 critical gaps
Quotation readiness
Data gaps and commercial conditions must be reviewed before commitment
Documentation completenessNo import completed
Review requiredArticle mapping36 / 40 verified
Review requiredPricing completeness39 / 40 priced
Review requiredMaterial availability34 / 40 covered
Review requiredTarget cost compliance€8.92 reduction required
Review requiredLead time complianceAbove six-week procurement target
Review requiredProject & material overview
Customer referenceVCE-EC250-2026
Product14682000 · Main chassis wiring harness
Product variantMedium
Unique material articles40
Annual volume500 units
Estimated purchasing cost€10,970.60
Preferred sourcing scenarioBaseline
Desired gross margin20%
Target delivery2027-01-05
Internal recommendation
Hold commercial commitment. Resolve critical data gaps, confirm article mappings and complete material pricing.
Risks & assumptions
- Engineering documentation and technical extraction are fictional.
- Unknown prices and inventory remain unknown; preliminary totals exclude them.
- Exchange rates, supplier performance and delivery times are simulated.
- Production and logistics costs are manually entered assumptions.
- No capacity check or verified production commitment is included.
- Any accepted risk must have a documented justification.
Outstanding exceptions
| SEVERITY | EXCEPTION | DESCRIPTION | DEPARTMENT |
|---|---|---|---|
| Critical | Insufficient available inventory | 420 pcs require purchasing. | Planning |
| Critical | Long supplier lead time | 12-week procurement exceeds the 6-week delivery target. | Procurement |
| Critical | Missing material price | Supplier price not available for 14682019. | Procurement |
| High | Missing article mapping | Corrugated conduit · Ø 10 mm requires article verification. | Engineering |
| High | Missing article mapping | Identification label · 30 mm requires article verification. | Engineering |
| High | Drawing revision mismatch | PVR revision C does not match drawing revision B. | Engineering |
| Medium | Unverified component substitution | Deutsch DT 12-pin connector requires article verification. | Engineering |
| Medium | Unknown inventory | Available inventory has not been confirmed. | Planning |
| Medium | Unverified component substitution | Silicone connector seal requires article verification. | Engineering |
| Low | Insufficient available inventory | 3,570 m require purchasing. | Planning |
| Low | Insufficient available inventory | 1,355 pcs require purchasing. | Planning |
| Low | Insufficient available inventory | 950 pcs require purchasing. | Planning |